Doing Business with South Carolina Department of Transportation

CADD Design

Engineering Directives

Hydraulic Engineering

Materials & Research

Plans Online (Archived)

Publications & Manuals

Road Design

Stormwater Management

Structural Design

Doing Business with SCDOT

Notice of Intent

SCDOT construction projects that require an NPDES permit must have a Notice of Intent (NOI) submitted to South Carolina Department of Health and Environmental Control. The NOI form along with the instructions can be accessed below.

-The Notice of Intent link below points to the South Carolina Department of Health and Environmental Control website.-

Related Documents:

Notice of Intent (NOI) for Stormwater Discharge from Large & Small Construction Activities (PDF 474 Kb)
Storm Water Pollution Prevention Plan Checklist (PDF 63 Kb)

To view PDF files, you will need Adobe Acrobat Reader